Professional Panel Upgrade Services

Is your electrical panel struggling to keep up with modern demands? EDG Electric specializes in electrical panel upgrades throughout NYC and Long Island. We'll upgrade your outdated 60A or 100A panel to a modern 200A or 400A system, providing the capacity you need for EV chargers, modern appliances, and home additions.

Signs You Need a Panel Upgrade

Insufficient Capacity

  • Frequent circuit breaker trips
  • Lights dim when appliances turn on
  • Need to unplug devices to use others
  • Can't add EV charger or major appliance

Safety Concerns

  • Panel is warm or hot to touch
  • Rust or corrosion on panel
  • Burning smell from panel
  • Federal Pacific or Zinsco panel

Age & Technology

  • Panel over 25 years old
  • Fuse box instead of breakers
  • No space for additional circuits
  • Home built before 1990

Panel Upgrade Services

100A to 200A Upgrade

Most common upgrade for modern homes

  • Supports EV chargers
  • Modern appliances
  • Home additions
  • Central AC systems

$2,500 - $4,500

Subpanel Installation

Add capacity to specific areas

  • Garage/workshop
  • Home addition
  • Basement finishing
  • Outdoor circuits

$800 - $2,000

Panel Upgrade Process

1. Assessment

We evaluate your current panel, electrical needs, and utility service capacity.

2. Utility Coordination

If needed, we coordinate with Con Edison or PSEG for service upgrade.

3. Permit Application

We handle all electrical permits required by NYC or local jurisdiction.

4. Panel Installation

Professional installation of new panel, usually completed in one day.

5. Inspection

City inspection scheduled and coordinated by our team.

6. Utility Connection

Utility company connects new service and restores power.

Quality Panel Brands We Install

Square D

Industry-leading reliability and safety features

Siemens

Innovative design with space-saving features

Eaton

Durable construction with excellent warranty

GE

Trusted name with wide parts availability

Panel Upgrade FAQs

How long does a panel upgrade take?

Most panel upgrades are completed in 6-8 hours. Your power will be off for 4-6 hours during installation.

Do I need a permit?

Yes, NYC and Long Island require permits for panel upgrades. We handle all permitting and inspections.

Will my power be off?

Yes, power will be off during installation. We schedule work to minimize inconvenience.

Can I add more circuits?

Yes! Most panel upgrades include space for additional circuits for future needs.

Ready to Upgrade Your Electrical Panel?

Get a free assessment and quote for panel upgrade

Request Free Quote